Guide
The tenant improvement process, from lease signing to turnover
A tenant improvement moves through six phases. Knowing what happens in each one, what you decide, and where time is usually lost helps you plan an opening date that holds up.
Phase 1: Scope
Scope is the written list of what will be built. It starts with the floor plan and the lease's work letter, which says what the landlord delivers, what the tenant builds and what the landlord contributes. A useful scope names the walls, the ceiling type, the doors and hardware, the finishes and the items that belong to other trades.
Your decisions: the room count and layout, finish quality, whether existing ceilings and doors stay, and what is nice to have versus required for opening.
Phase 2: Bid
The contractor walks the space, measures it and prices the scope. An itemized bid lists each part of the work with its own price, plus allowances and exclusions. Comparing two bids is only fair when both cover the same scope, so ask each bidder to confirm what is left out.
Your decisions: which contractor, which options to take, and whether the total fits the budget and the landlord's contribution.
Phase 3: Permit
Most commercial interior work needs a permit from the local building department, and the landlord usually has to approve the plans first. Review comments may come back and need answers. Work does not start until the permit is issued. The Dallas page covers what the City of Dallas lists for its finish-out permit.
Your decisions: who submits, who answers review comments, and who pays permit fees. Settle these before you sign.
Phase 4: Construction
Construction follows the order described in the office build-out guide: demolition, framing, work inside the walls and above the ceiling, inspection, drywall, ceiling, paint, trim. Weekly progress updates and photos keep everyone aligned. Changes are priced and approved in writing before the work happens.
Your decisions: finish selections on time, approval of changes, and building access for crews.
Phase 5: Punch list
Near the end, you and the contractor walk the space and write down every small item to fix: a paint touch-up, a door that rubs, a ceiling tile that does not sit flat, a scuffed base. The contractor works through the list and you confirm each item is closed. A thorough walk in good light, with a copy of the plans, catches the most.
Phase 6: Closeout and turnover
Closeout is the paperwork and the handover: final inspection sign-off, any certificate of occupancy the jurisdiction requires, keys and hardware schedules, paint colors and product information for future touch-ups, and the final billing documents. Landlords often want these documents before they release allowance funds.
What a TI allowance is, and how it is usually paid
A tenant improvement allowance is money the landlord contributes toward the build-out. It is set in the lease, and it is commonly stated as a dollar amount per rentable square foot. This section describes general practice. Your lease controls, and a real estate attorney or broker should read it.
- Reimbursement. The tenant pays the contractor, then the landlord repays up to the allowance once the work is done.
- Direct payment or progress draws. The landlord pays the contractor, sometimes in stages as work is completed.
- Rent credit. The allowance reduces rent over a set number of months.
Landlords commonly ask for proof of payment and lien waivers from the contractor and the subcontractors before they release funds. Leases often exclude furniture and moving costs. Whether design fees count differs from lease to lease. If your build-out costs more than the allowance, the tenant normally covers the rest.
Typical decisions and delays
- Landlord plan approval. Review rounds add days. Send complete plans the first time.
- Permit review comments. Each round of comments restarts a clock you do not control.
- Long-lead items. Special doors, glass and some fixtures take longer to arrive than the walls take to build. Order early.
- Building access. Elevator and dock reservations, after-hours rules and insurance paperwork can stall a start date.
- Hidden conditions. Opening a wall or a ceiling can reveal something the plan did not show.
- Late changes. A new room or a changed finish after framing begins affects every trade after it.
- Inspection failures. A failed inspection must be corrected and rescheduled before walls close.
No schedule can be promised without seeing the space, the plans and the building's rules. Treat any timeline as an estimate until those three are known.
Common questions
When should I bring in a contractor?
Before the lease is final if you can. A contractor can walk the space and flag cost or schedule risks while you still have room to negotiate the allowance, the delivery condition and the turnover date.
Who pulls the permit on a tenant improvement?
It depends on the lease and the contract. On projects we build, we submit the plans, pull the permit for our scope and coordinate inspections with the city. Confirm this in writing for every bid you compare.
What if the build-out costs more than the allowance?
The tenant usually pays the difference. That is why a scoped, itemized bid matters before the lease is signed or the work letter is finalized.
What if the build-out costs less than the allowance?
Many leases let the landlord keep the unused portion, and some let the tenant apply it to other costs. Check the work letter before you assume either.
Keep reading
- Ceilings, drywall and paint
The finish trades that decide how the space looks.
- Back to the home page