Office build-outs

Office build-outs: scope, sequence and who handles what

An office build-out turns open floor area into rooms people can work in. Here is what a typical scope contains, the order the work runs in, how responsibility usually splits between landlord and tenant, and what to ask a contractor before you commit.

What the scope typically includes

No two suites are the same, but office scopes tend to draw from the same list. Your plans and lease exhibit decide which items apply.

  • Demolition and protection. Removing old partitions, carpet or ceiling sections, and protecting floors, elevators and shared corridors.
  • Demising walls. The walls between your suite and the neighbor or the corridor. They often carry fire or sound ratings, which changes how the wall is built and where it must reach. Your plans will call out the type.
  • Interior partitions. Metal stud walls for private offices, conference rooms, supply rooms and restrooms, with insulation where the plan asks for sound control.
  • Ceilings. New suspended grid and tile, or patching and re-leveling the existing ceiling, with openings cut for lights, air devices and sprinkler heads.
  • Doors, frames and hardware. Interior and suite-entry doors, with locks and closers set to the plan and the building's standard.
  • Paint and wall finishes. Primer and finish coats, with accent walls or wall coverings where specified.
  • Finish carpentry. Base and trim, reception counters, caps on half-height walls, and installed casework.
  • Final cleaning and punch list.

Electrical, data, plumbing, air distribution and fire protection are part of most build-outs too. They are performed by their own trades. A good general contractor schedules them into the sequence below, but their pricing comes from those trades.

Two workers on a ladder finishing a drywall partition with a framed door opening, floor covered in plastic sheeting under an existing grid ceiling
Partition walls near finish in an office suite. The existing grid ceiling stays in place while the new rooms are built under it.

Typical sequencing

  1. Layout. Wall lines are marked on the slab from the plan and checked against columns, windows and the building's fixed elements.
  2. Framing. Track goes down at the floor and up at the structure or ceiling line, then studs and door frames.
  3. In-wall and above-ceiling work. Other trades run what must sit inside the walls. This is the stage where most coordination problems appear.
  4. Inspection. The jurisdiction checks the framed walls and rough work before they are covered. Closing walls early is a common way to lose days.
  5. Drywall. Board is hung, then taped and finished to the level the plan requires. See the finish levels explained.
  6. Ceiling grid. The grid goes in after the walls are boarded, so the wall angle can be set cleanly. Tile follows once paint is done.
  7. Paint. Primer, then finish coats. Ceilings and walls are usually painted before tile and base go in.
  8. Trim, doors and hardware. Base, casework, door slabs and hardware.
  9. Punch list, cleaning and turnover.

Floor finishes and furniture deliveries are scheduled around this order. A common scheduling mistake is promising a furniture date before the final inspection is done.

What the landlord and the tenant usually handle

The lease and its work letter decide this, so read them before you assume. The pattern below is common, not universal.

Landlord side

  • The building shell, structure and base building systems.
  • Approval of the tenant's plans and of the contractor working in the building.
  • Rules for after-hours access, elevator and loading dock use, and insurance forms.
  • Any TI allowance, paid under the lease terms.

Tenant side

  • The design and the permit documents for the suite.
  • Hiring the contractor and paying for work above any allowance.
  • Furniture, equipment, phone and data cabling, and signage.
  • Decisions on finishes, colors and layout changes while the job is under way.

A tenant representative or property manager often sits between the two. A short written list of who owns each item, agreed before bids go out, prevents most disputes.

Questions to ask a contractor

  • Can you bid from my permit set and flag conflicts before they reach the field?
  • Which parts of the scope are priced by you and which by other trades?
  • Is the bid itemized by line, with allowances and exclusions listed?
  • Who submits the permit and who schedules the inspections?
  • What does the building require from you: insurance certificates, hours, dock times?
  • Can you work after hours if the building is occupied? Is that priced in?
  • What drywall finish level is in the bid, and does it match my paint sheen?
  • How are changes priced and approved, and in what form?
  • Who is my day-to-day contact, and how often will I get a progress update?
  • How is the punch list handled, and when is it closed out?

Ask for the answers in writing. They become the baseline for comparing bids.